Hyde Construction — Athens, TN

Equipment: StraightLine® 5.0 RockEye Hammer System System on a Vermeer® D50x100, coupled with an Ingersoll Rand 1100cfm x 385 psi compressor The Challenge: 600′ of some of the hardest limestone in the heart of the Ozark Mountains, under a man-made lake, alongside the White River, 15 miles northwest of Mountain Home, Arkansas. That was the … Continued

CD Brown Construction, Inc. — Henryetta, OK

Equipment: StraightLine® 4.0 RockEye Hammer System coupled with an Atlas Copco 1000cfm/350psi compressor on a Vermeer® D24x40 Series II. The Challenge: A shot under Interstate Highway 40, with a depth of 35′, and back up again, 600′ down the line, was the challenge issued to StraightLine® HDD, Inc. “We are looking for a more effective … Continued