Double S Construction — Big Springs, TX

Ground conditions: Solid limestone and iron rock Project: Placing conduits for power and control cables for a wind generator farm. Bores ranged from 150-200′; installing 6-inch conduit for main electric cables to deliver the generated power & a 2-inch conduit for the control cables at a spacing of 3-feet apart. The conduits were placed by … Continued

Melcar Drilling Technologies — Taylorsville, NC

Equipment: Vermeer® 24x40a and a StraightLine® 5″ Air Hammer System. This combination allowed excellent penetration rates in the granite while also providing the flexibility needed to accomplish the vast grade changes. Ground conditions: Bore length was just over 300′, the first 200′ was solid granite and the last 150′ was 60% granite and the balance … Continued

Drilling Technologies, Inc. — Fishkill, NY

Equipment: Astec® DD3238 and a StraightLine® 4″ Air Hammer System. Ground conditions: First 90 feet consisted of dirt and rocks smaller than 3-feet, the last 100-feet was solid granite. Project: Water service requiring a minimum 3-foot of cover that totaled 190′ in length. Over the course of the bore the elevation rose 40-feet. Entered the … Continued

Drilling Technologies, Inc. — Fishkill, NY

Equipment: Astec® DD3238 and a StraightLine® 4″ Air Hammer System. Ground conditions:Clay soil with 3 x 10+ foot diameter granite boulders in the bore path. Project: water service requiring a minimum 3-feet of cover that totaled 90-feet in length. Entered the ground at a minus 18%, drilled conventionally until a boulder was encountered, engaged the … Continued