Home :: News & Blog :: Get A Catalog :: About Us :: Contact Us
Follow Us On Facebook Follow Us On Twitter Follow Us On YouTube
Call Toll Free 1-800-654-3484

Air Hammer Job Site Stories

Kaydyn Directional Drilling — Union City, PA

Equipment: JT2020 and a StraightLine® 4" Air Hammer System.

Ground conditions: approximately 12 to 18" of top soil with solid limestone formation underneath.

Project Scope and Requirements: this project consisted of 70 replacement water services. 1" copper lines were placed under the roadway at a minimum cover of 4'. The bore that is featured was 70' in length and took just under 2 hours to complete including utility installation.

Click to Enlarge.

Join Our Mailing Lists :: Financing :: Privacy Policy :: Legal :: Support :: Sitemap
Copyright © 2010-2011 StraightLine HDD, All Rights Reserved.